Skip to content
Concrete2Coatings
Concrete 2 Coatings flooring work

Service area

Epoxy floors in Pasadena.

Concrete 2 Coatings pours metallic epoxy, garage coatings, flake systems, polished concrete, and decorative concrete in Pasadena, CA. Same union-trained crew, same owner, same fixed-price proposal.

Why Pasadena clients call us.

San Gabriel Valley foothill. Pop: 138k. Climate: foothill heat.
Concrete 2 Coatings serving Pasadena, California
Recent Pasadena install.

Pasadena is San Gabriel Valley foothill. The climate here brings foothill heat, San Gabriel Mountain rain shadow, dry winters. That climate matters for two reasons: substrate moisture and topcoat UV exposure.

Slab moisture in Pasadena runs above the national average in winter and falls dramatically during summer heat. Every floor we pour starts with a calibrated moisture test, not a visual call. UV exposure on outdoor patios and pool decks rules out bare epoxy and pushes us to polyaspartic or UV-stable topcoat chemistry.

Where we pour in Pasadena

Bungalow Heaven, Madison Heights, Linda Vista, East Pasadena, Hastings Ranch, Old Pasadena, and the rest of the Pasadena footprint. Access via CA-134, I-210, CA-110. Most Pasadena jobs schedule three to seven days out for the walkthrough, then four weeks out for residential pours, two weeks for commercial.

Most-requested in Pasadena

Pasadena, CA. We pour throughout the city, with CA-134 as the primary access corridor.

Local context.

A few Pasadena-specific notes that come up on most walkthroughs.

Pasadena climate context for floor coating projects

Climate

foothill heat, San Gabriel Mountain rain shadow, dry winters. Slab moisture testing is non-negotiable on every Pasadena pour because of how the seasonal swings work here.

Concrete 2 Coatings service truck en route to Pasadena

Access

Shop access via CA-134, I-210, CA-110. Pasadena is within the 100-mile pour radius from Walton Avenue, Los Angeles.

Typical residential garage substrate in Pasadena

Common substrates

Pasadena residential garages are typically 4-inch poured concrete from the original construction era. Older homes particularly in older sub-areas sometimes need crack repair before any coating goes down.

Most-requested system in Pasadena: metallic epoxy

Most-requested system

Metallic epoxy for residential garages, polyaspartic for patios and pool decks, decorative stamped concrete for backyard living spaces.

Pasadena neighborhoods we pour in.

Pasadena core

  • Bungalow Heaven
  • Madison Heights

Pasadena mid

  • Linda Vista
  • East Pasadena

Pasadena outer

  • Hastings Ranch
  • Old Pasadena

What Pasadena jobs actually look like.

Twelve months of Pasadena work points at a consistent pattern: residential garage floors lead the volume, decorative concrete patios run second, commercial spec floors round out the rest.

Residential garage epoxy install in Pasadena

Residential Pasadena garages

Most garage jobs are done in two days. The system is metallic epoxy with a polyaspartic topcoat, laid over a slab we have repaired first, since cracks are close to universal on concrete that is 15 to 60 years old. The usual space is a two-car attached garage of 380 to 480 sq ft. The install is simple; the color conversation is where people take their time.

Decorative concrete patio in Pasadena

Pasadena backyards and patios

Decorative concrete patios, pool decks, BBQ extensions, and walkways across the Pasadena footprint. Most are 300 to 800 sq ft. Stamped concrete with two-color integral plus accent release prices out on pattern complexity, color count, and the condition of the base slab. The walkthrough takes 45 minutes so we can inspect drains, expansion joints, and any tile or wood deck the new pour ties into.

Commercial epoxy floor in Pasadena

Small commercial + shop floors

Pasadena retail backrooms, light industrial shops, restaurant kitchens, and detail-shop bays. Square footage usually 600 to 4,000. Polyaspartic-only systems for fast turnaround, quartz-broadcast where slip rating or USDA compliance matters. We schedule around operating hours; off-hours premium applies but the saved revenue usually offsets.

Questions before the call.

How fast can you get to a job in Pasadena?

Pasadena sits within the 100-mile pour radius from our Walton Avenue shop, accessed via CA-134 and I-210. Walkthroughs typically schedule three to seven days out. Pours book four weeks out for residential and two weeks for commercial.

Do you pour metallic epoxy in Pasadena?

Yes. Metallic epoxy is one of our most-requested systems in Pasadena, particularly for residential garage floors in Bungalow Heaven, Madison Heights, Linda Vista, and surrounding neighborhoods. The walkthrough is on us; the proposal lands the next morning.

What does Pasadena epoxy cost in Los Angeles?

Residential pricing for Pasadena epoxy in the Los Angeles market typically runs between the ranges quoted on our service pages, with the exact number determined by substrate condition, finish system, and square footage. Commercial pricing is always project-specific.

You get one fixed number, in writing, before any work starts. We set it after a free on-site walkthrough of about 30 minutes and email the proposal the next morning, so nothing gets added halfway through the pour.

How long does a Pasadena job take to install?

Plan on two to three working days for a typical home, counting prep through the final topcoat. Commercial floors and bigger residential jobs take longer, anywhere from four to fifteen days, set by the system spec, the slab’s condition and the square footage.

The polyaspartic topcoat cures fast, so the wait after we finish is short: one day before foot traffic, three days before anything on wheels.

What about Pasadena climate, will the floor hold up?

The Pasadena climate brings foothill heat, San Gabriel Mountain rain shadow, dry winters. Our system specs (polyaspartic topcoat for UV exposure, polyurea joint fill for thermal swing, calibrated moisture testing on prep day) account for these conditions specifically. Every floor we pour in Pasadena is built to the same lifetime-adhesion spec we apply on coastal-marine, high-desert, or central-valley jobs.

What happens after the floor is poured?

You deal with the same people after the pour that you dealt with before it. The owner walks every job, so if something about the finish looks off to you, that is who you talk to. The resin bonded to your slab stays where it is; the topcoat is the only layer that ever needs attention.

There is no maintenance plan to sign up for. We built the system so it does not need one: mop it damp when it gets dirty and leave it be the rest of the time.

Metallic epoxy floor poured by Concrete 2 Coatings in Los Angeles

Pour in Pasadena.

Free walkthrough on your slab in 30 minutes. Fixed-price proposal next morning. (714) 702-2567 or fill the form below.