Skip to content
Concrete2Coatings
Concrete 2 Coatings flooring work

Service

Cove Base in Los Angeles.

Integral epoxy cove base. We pour a coved transition from floor to wall in the same epoxy or urethane cement as the floor system, eliminating the harbor point at the floor/wall junction. Required for USDA, FDA, and most healthcare specs.

What cove base actually is.

Common in food and beverage.
Cove Base installation by Concrete 2 Coatings in Los Angeles
Cove Base on a recent Concrete 2 Coatings job.

Integral epoxy cove base. We pour a coved transition from floor to wall in the same epoxy or urethane cement as the floor system, eliminating the harbor point at the floor/wall junction. Required for USDA, FDA, and most healthcare specs.

The system

  • No harbor points (no dirt or pathogen retention)
  • Seamless transition from floor to wall
  • USDA, FDA, and healthcare-compliant installations
  • Color-matched to floor or contrasting accent option

What it costs

Priced by linear footage of wall, and how many inside and outside corners the room has. Corners are the slow part. Whether it ties into an existing floor system matters too. We measure, then quote.

How long it takes

Added one to two days to the floor system schedule.

How long it lasts

Matches the floor system (15-25 years).

Where this fits

Food and beverage, healthcare, veterinary, pharmaceutical, anywhere sanitary specifications apply.

How a cove base floor actually gets poured.

On-site walkthrough and slab inspection

01 Walkthrough

Owner on site. Moisture test of the slab. Photos of existing cracks. Palette options walked in person. Proposal in your inbox next morning.

Diamond-ground substrate ready for resin

02 Diamond grind

Surface prep to CSP-3 profile, HEPA vacuum, rapid-set polyurea on crack lines, re-grind. Where every floor lives or dies.

Cove Base pour day in progress

03 Pour

Resin mixed on site, broadcast or swirled to match the system. Signature work happens here. Notched-trowel finish before the working window closes.

Polyaspartic topcoat applied over a cured pour

04 Topcoat

Polyaspartic or polyurethane within the resin chemical window. Walkable 24 hours, full traffic 72 hours. Written job spec before we leave.

Where we install cove base.

We pour cove base across all of our service areas: Los Angeles County, Orange County, the Inland Empire, San Diego County, Ventura County, Kern County, and Santa Barbara County. The system itself is the same across cities. Substrate prep adjusts to local concrete age and moisture conditions.

Three rules we do not break on a cove base install.

Most of what separates a coating that lives 15 years from one that fails at year three is decided on prep day, before any resin gets mixed. Here is what we will not skip, regardless of project budget.

Calcium chloride moisture meter test on a residential slab

01. Calibrated moisture testing

Calcium chloride or relative-humidity sleeve test on every cove base substrate before we order resin. If the vapor emission rate is above manufacturer spec, we apply a moisture-mitigation primer at our cost rather than gamble on the topcoat bond. Skipping this is the most common cause of the failed coatings we get called in to re-prep.

Diamond-ground concrete substrate ready for resin

02. Diamond grind to spec

CSP-3 minimum for residential cove base, CSP-4 for high-build commercial. Shot blasting and acid etching are cheaper shortcuts that fail the resin manufacturer’s adhesion spec. We grind, HEPA-vacuum, polyurea-fill every visible crack, and re-grind. The prep day is the day the floor lives or fails.

Finished metallic epoxy floor with written job spec

03. Spec sheet with the resin maker named

Every cove base proposal we write names the resin manufacturer, the topcoat product, the substrate prep depth, the cure window, and the maintenance schedule. If a competitor’s proposal does not name these, you are buying on faith, not specs. Full liability and workers’ comp on every job.

Questions before the call.

What does cove base cost in Los Angeles?

Residential pricing for cove base in the Los Angeles market typically runs between the ranges quoted on our service pages, with the exact number determined by substrate condition, finish system, and square footage. Commercial pricing is always project-specific.

Square footage, crack repair and the finish system drive the number, which is why we look before we price. The walkthrough is free and runs about 30 minutes, and your fixed-price proposal lands in your inbox the next morning.

How long does cove base take to install?

A standard residential pour runs two to three working days from prep to final topcoat. Larger residential or commercial pours can run four to fifteen days depending on system spec, substrate condition, and square footage.

Vehicles and rolling loads stay off for 72 hours after the last coat. People can walk across the floor after the first 24.

How long will my cove base last?

A resinous floor system bonds chemically to the concrete under it. On residential floors, that adhesion is engineered to last the life of the slab.

The part that wears is the topcoat. On a residential floor that gets heavy use, plan to refresh the polyaspartic around year 8 to 12; the resin under it stays put. Commercial resin layers usually run 10 to 25 years, depending on traffic and chemistry.

Can you match a specific color?

Metallic pigment mixes to anything on the spectrum, so a metallic floor can be whatever color you bring us. We have done everything from mother-of-pearl to just-black.

The pre-blended flake packs cover a lot of ground, and when they miss, we build a custom blend. Quartz runs 14 standard colors before custom mixing. Decorative concrete takes color two ways, integral during the pour or a topical stain post-cure.

How does the install process actually work?

It ends with you and us on the floor together for a final inspection, and a written job spec in your hands before the crew leaves. Getting there takes four stages: the walkthrough and a moisture test, then diamond grinding to CSP-3 with any crack repair, then the pour and broadcast, and last the polyaspartic topcoat.

What happens after the floor is poured?

The two layers age differently. The base resin is bonded to the substrate and stays put for the life of the floor. The topcoat is the part that takes the foot traffic and the tires, so that is the layer we look at again down the road and refresh when the gloss fades.

Day to day it cleans with a damp mop, which is all the upkeep the system asks for. You will not be buying wax or booking a resealing crew.

What makes Concrete 2 Coatings different from other contractors?

We come out of a family of tradespeople and the union, with 20 years of trade experience behind the company. That is why we can coat a floor, pour decorative concrete and set a structural slab ourselves, where most LA shops stick to one. The owner is on site for every prep day, so the grinding gets done to spec.

Metallic epoxy floor poured by Concrete 2 Coatings in Los Angeles

Pour cove base at your place.

Free walkthrough in 30 minutes. Fixed-price proposal in your inbox the next morning. (714) 702-2567 or the form below.