Skip to content
Concrete2Coatings
Concrete 2 Coatings flooring work

Service

Veterinary & Kennel Epoxy in Los Angeles.

Vet clinic and kennel flooring built for urine, kennel cleaning chemistry, and the constant scratch of claws. Slip-rated, chemical-resistant, integral cove base.

What veterinary and kennel epoxy actually is.

Common in veterinary clinics.
Veterinary & Kennel Epoxy installation by Concrete 2 Coatings in Los Angeles
Veterinary & Kennel Epoxy on a recent Concrete 2 Coatings job.

Vet clinic and kennel flooring built for urine, kennel cleaning chemistry, and the constant scratch of claws. Slip-rated, chemical-resistant, integral cove base.

The system

  • Urine-resistant resin chemistry
  • Quartz-broadcast traction for wet kennel runs
  • Integral cove base to slab
  • Antimicrobial topcoat additives

What it costs

Kennel runs need seamless cove base, sanitary detailing, and a topcoat that survives daily disinfectant, so the linear footage of walls matters as much as the floor area. Quoted flat after we walk the runs.

How long it takes

Three to seven working days.

How long it lasts

15-20 years.

Where this fits

Veterinary clinics, animal hospitals, boarding kennels, grooming salons, doggy daycare, pet retail.

How a veterinary and kennel epoxy floor actually gets poured.

On-site walkthrough and slab inspection

01 Walkthrough

Owner on site. Moisture test of the slab. Photos of existing cracks. Palette options walked in person. Proposal in your inbox next morning.

Diamond-ground substrate ready for resin

02 Diamond grind

Surface prep to CSP-3 profile, HEPA vacuum, rapid-set polyurea on crack lines, re-grind. Where every floor lives or dies.

Veterinary & Kennel Epoxy pour day in progress

03 Pour

Resin mixed on site, broadcast or swirled to match the system. Signature work happens here. Notched-trowel finish before the working window closes.

Polyaspartic topcoat applied over a cured pour

04 Topcoat

Polyaspartic or polyurethane within the resin chemical window. Walkable 24 hours, full traffic 72 hours. Written job spec before we leave.

Where we install veterinary and kennel epoxy.

We pour veterinary and kennel epoxy across all of our service areas: Los Angeles County, Orange County, the Inland Empire, San Diego County, Ventura County, Kern County, and Santa Barbara County. The system itself is the same across cities. Substrate prep adjusts to local concrete age and moisture conditions.

Three rules we do not break on a veterinary and kennel epoxy install.

Most of what separates a coating that lives 15 years from one that fails at year three is decided on prep day, before any resin gets mixed. Here is what we will not skip, regardless of project budget.

Calcium chloride moisture meter test on a residential slab

01. Calibrated moisture testing

Calcium chloride or relative-humidity sleeve test on every veterinary and kennel epoxy substrate before we order resin. If the vapor emission rate is above manufacturer spec, we apply a moisture-mitigation primer at our cost rather than gamble on the topcoat bond. Skipping this is the most common cause of the failed coatings we get called in to re-prep.

Diamond-ground concrete substrate ready for resin

02. Diamond grind to spec

CSP-3 minimum for residential veterinary and kennel epoxy, CSP-4 for high-build commercial. Shot blasting and acid etching are cheaper shortcuts that fail the resin manufacturer’s adhesion spec. We grind, HEPA-vacuum, polyurea-fill every visible crack, and re-grind. The prep day is the day the floor lives or fails.

Finished metallic epoxy floor with written job spec

03. Spec sheet with the resin maker named

Every veterinary and kennel epoxy proposal we write names the resin manufacturer, the topcoat product, the substrate prep depth, the cure window, and the maintenance schedule. If a competitor’s proposal does not name these, you are buying on faith, not specs. Full liability and workers’ comp on every job.

Questions before the call.

What does veterinary and kennel epoxy cost in Los Angeles?

Residential pricing for veterinary and kennel epoxy in the Los Angeles market typically runs between the ranges quoted on our service pages, with the exact number determined by substrate condition, finish system, and square footage. Commercial pricing is always project-specific.

It depends on your slab, so we price it in person. The walkthrough costs nothing and takes about half an hour. The next morning you get a fixed price by email, and that number holds through the pour.

How long does veterinary and kennel epoxy take to install?

On most homes we are in and out in two to three working days, and that covers grinding, crack repair, the pour and the topcoat; the walkthrough and moisture test happen before we book the days. Larger residential floors and commercial work run four to fifteen days.

You can walk on it 24 hours after the last coat of polyaspartic goes down. Give it 72 hours before vehicles or heavy equipment roll on it.

How long will my veterinary and kennel epoxy last?

The coating holds because it bonds chemically with the substrate. That is why the prep matters so much, and why a properly prepped residential floor is built for lifetime adhesion.

The polyaspartic topcoat can be refreshed at the 8-to-12-year mark on heavy-use residential floors. The base resin stays bonded. Commercial systems are spec’d to traffic and chemistry; typical lifespan is 10-25 years on the resin layer.

Can you match a specific color?

Any color works in metallic epoxy, since the pigments mix across the full spectrum. Just-black and mother-of-pearl are both floors we have poured.

Quartz has 14 standard colors, and we can mix a custom one if none of them fit. Flake works the same way: start from a pre-blended pack or build your own blend. On decorative concrete, color is either mixed into the pour or stained on after it cures.

How does the install process actually work?

It ends with you and us on the floor together for a final inspection, and a written job spec in your hands before the crew leaves. Getting there takes four stages: the walkthrough and a moisture test, then diamond grinding to CSP-3 with any crack repair, then the pour and broadcast, and last the polyaspartic topcoat.

What happens after the floor is poured?

The two layers age differently. The base resin is bonded to the substrate and stays put for the life of the floor. The topcoat is the part that takes the foot traffic and the tires, so that is the layer we look at again down the road and refresh when the gloss fades.

Day to day it cleans with a damp mop, which is all the upkeep the system asks for. You will not be buying wax or booking a resealing crew.

What makes Concrete 2 Coatings different from other contractors?

Most contractors in LA do one thing. We are licensed and trained in three: resinous coatings, decorative concrete and structural slabs, so a cracked slab under your coating does not get handed off to someone else. The owner walks each job and shows up on prep days, and the prep itself (grind to CSP-3, HEPA-vacuum, grind again) never gets cut.

Metallic epoxy floor poured by Concrete 2 Coatings in Los Angeles

Pour veterinary and kennel epoxy at your place.

Free walkthrough in 30 minutes. Fixed-price proposal in your inbox the next morning. (714) 702-2567 or the form below.